Superintelligence Index

AI data centers in Georgia

3 large AI data centers in Georgia are tracked by Epoch AI, in Fayetteville, Dalton, Atlanta. Together they are planned to draw 681 MW of IT power, 2% of all tracked US AI capacity (rank 11 of 18 states with a page).

GeorgiaMicrosoft Fairwater Atlanta — Fayetteville, Georgia. Owner Microsoft; users OpenAI, Microsoft. 636 MW online now. Epoch AI estimate.CoreWeave Dalton 1 & 2 — Dalton, Georgia. Owner CoreWeave; users OpenAI. 28 MW online now. Epoch AI estimate.xAI QTS Atlanta — Atlanta, Georgia. Owner SpaceXAI; users SpaceXAI. 17 MW online now. Epoch AI estimate.Fayetteville 636 MWDalton 28 MWAtlanta 17 MW
Circle area = planned IT power. Locations approximate.

fully online partly online (solid area = share running today) under construction

The sites

Data centerLocationOwnerMain usersOnline now (MW)Planned (MW)Full power by
Microsoft Fairwater AtlantaFayettevilleMicrosoftOpenAI, Microsoft636636online
Building 3 and 4 are operational.
CoreWeave Dalton 1 & 2DaltonCoreWeaveOpenAI2828online
Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery.
xAI QTS AtlantaAtlantaSpaceXAISpaceXAI1717online
No significant change to the building since the August 2025 image.

Grey rows: Epoch's latest construction note for each site, from satellite images, permits and filings.

Source: Epoch AI, ‘AI data centers’, licensed under CC BY 4.0; adapted by us (see Source and license below). Retrieved 2026-11-27.Estimates; locations approximate

Power coming online in Georgia

By the end of 2027 the tracked Georgia sites should reach about 0.68 GW of IT power. Hollow bars are planned dates.

0 GW0.2 GW0.4 GW0.6 GW202320242025202620272028End 2023: 0.00 GW IT powerEnd 2024: 0.00 GW IT powerEnd 2025: 0.34 GW IT powerToday: 0.68 GW IT powerEnd 2027: 0.68 GW IT powerEnd 2028: 0.68 GW IT power

online planned completion dates

Who builds and who uses them

Owners (by planned power): Microsoft (636 MW), CoreWeave (28 MW), SpaceXAI (17 MW).
AI companies running on these sites: OpenAI, Microsoft, SpaceXAI.

Local opposition and moratoria in Georgia

WhereActionStatusDateWhat it doesSources
Dade Countymoratoriumin force2026-11-05
ends 2027-02-03
Commissioners unanimously approved a 90-day moratorium after residents objected to a proposed 300-megawatt data center. The end date is 90 days after adoption.Chattanooga Times Free Press
Paulding Countymoratoriumin force2026-07
ends 2027-01-01
Commissioners unanimously froze new data center projects until January 1, 2027, while the county updates its development codes.FOX 5 Atlanta
DeKalb Countymoratoriumunclear2026-06
ends 2026-09-30
Commissioners extended an existing moratorium on new data center applications by about 100 days, to the end of September 2026. It had been due to expire on June 23. No later action was confirmed, so its current status is unclear.CBS News Atlanta
Coweta Countymoratoriumunclear2025-05Commissioners unanimously adopted a 180-day moratorium in May 2025, after the $17 billion Project Sail campus was proposed, and it ran until November 2025. Local press reported a second 180-day pause on 2026-06-16, running to about late December 2026, but that report could not be fetched to confirm, so the current status is unclear.GovTech (Atlanta Journal-Constitution) WSB-TV via Yahoo News The Newnan Times-Herald
Douglas Countymoratoriumexpired2025-03The county adopted a 90-day moratorium on data centers in March 2025, the first in the Atlanta area, so it could review its rules. A 90-day term would have ended around June 2025.GovTech (Atlanta Journal-Constitution)

Full list: data center moratorium tracker.

See all states on the US AI data center map.

Source and license

This page is built on free public data from Epoch AI, a nonprofit research institute that tracks AI compute, chips and data centers. Epoch AI publishes its data under the Creative Commons Attribution 4.0 license (CC BY 4.0), which allows reuse with credit.

What we changed: we kept the US sites only; placed each site on the map from its street address (US Census geocoder), ZIP code centre or the town named in Epoch's sources, so positions are approximate; removed confidence tags from owner and user names; took planned power and dates from Epoch's construction timelines; and summed totals by state and company. State outlines: US Census Bureau (public domain), via the us-atlas project (ISC license).

Reuse: you may reuse this page’s charts, maps, tables, text and calculations, including for commercial use, under the CC BY 4.0 license. Credit both sources, for example: “Source: Superintelligence Index (thesuperintelligenceindex.com), based on Epoch AI data, CC BY 4.0”, and link to this page. Epoch AI’s underlying data stays under its own CC BY 4.0 license. Our terms of use do not restrict either.

Epoch AI provides its data as-is and without warranties; see sections 5 and 6 of the license (disclaimer of warranties and limitation of liability). Epoch AI is not affiliated with this site and does not endorse it or our calculations. Any errors in the adaptation are ours. Information only, not financial advice.

Map outline license (us-atlas)

State outlines are drawn from us-atlas v3 (states-10m), derived from US Census Bureau cartographic boundary files (public domain).

Copyright 2013-2019 Michael Bostock. Permission to use, copy, modify, and/or distribute this software for any purpose with or without fee is hereby granted, provided that the above copyright notice and this permission notice appear in all copies. THE SOFTWARE IS PROVIDED “AS IS” AND THE AUTHOR DISCLAIMS ALL WARRANTIES WITH REGARD TO THIS SOFTWARE INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS. IN NO EVENT SHALL THE AUTHOR BE LIABLE FOR ANY SPECIAL, DIRECT, INDIRECT, OR CONSEQUENTIAL DAMAGES OR ANY DAMAGES WHATSOEVER RESULTING FROM LOSS OF USE, DATA OR PROFITS, WHETHER IN AN ACTION OF CONTRACT, NEGLIGENCE OR OTHER TORTIOUS ACTION, ARISING OUT OF OR IN CONNECTION WITH THE USE OR PERFORMANCE OF THIS SOFTWARE.

Frequently asked questions

How many AI data centers are in Georgia?
Epoch AI tracks 3 large AI data centers in Georgia. Smaller and older data centers are not in the list.
What is the largest AI data center in Georgia?
Microsoft Fairwater Atlanta in Fayetteville, owned by Microsoft, planned at 636 MW of IT power by Epoch's estimate.
How much power do AI data centers in Georgia use?
About 681 MW of IT power today across the tracked sites, rising to 681 MW when all are built.
Which companies are building AI data centers in Georgia?
By planned power: Microsoft, CoreWeave, SpaceXAI.
Are there data center moratoriums in Georgia?
Our tracker lists 5 local or state action(s) in Georgia; see the table on this page, each with sources.