AI data centers in New York
2 large AI data centers in New York are tracked by Epoch AI, in Barker. Together they are planned to draw 436 MW of IT power, 1% of all tracked US AI capacity (rank 16 of 18 states with a page).
- 2 sites
- 268 MW online today
- 436 MW planned
- #16 US state by planned power
fully online partly online (solid area = share running today) under construction
The sites
| Data center | Location | Owner | Main users | Online now (MW) | Planned (MW) | Full power by |
|---|---|---|---|---|---|---|
| Anthropic Lake Mariner | Barker | AI XPV Platform | Anthropic | 210 | 378 | 2027-03 |
| Building 2 (AKA CB4) is operational. Next (2027-03): Building 3 (AKA CB5) is operational. | ||||||
| Core42 Lake Mariner | Barker | Core42 | G42 | 58 | 58 | online |
| Both buildings still operational according to satellite imagery. | ||||||
Grey rows: Epoch's latest construction note for each site, from satellite images, permits and filings.
Power coming online in New York
By the end of 2027 the tracked New York sites should reach about 0.44 GW of IT power. Hollow bars are planned dates.
online planned completion dates
Who builds and who uses them
Owners (by planned power): AI XPV Platform (378 MW), Core42 (58 MW).
AI companies running on these sites: Anthropic, G42.
Local opposition and moratoria in New York
| Where | Action | Status | Date | What it does | Sources |
|---|---|---|---|---|---|
| State of New York (Executive Order 62) | moratorium | in force | 2026-07-14 | The governor ordered the state environmental agency to hold pending discretionary permits for new or expanded data centers of 50 megawatts or more until a statewide environmental impact study is finished. It cites grid strain, ratepayer costs, water, air and noise, and does not cover local permits. | Office of the Governor of New York |
| Town of Brookhaven | moratorium | in force | 2026-07 | After a long public hearing, the town board approved an 18-month moratorium on approving new data centers, citing the electric grid and protection of the drinking-water aquifer. | Fire Island News |
| Town of East Fishkill | moratorium | in force | 2026-06-25 | The town board unanimously adopted a three-year moratorium on data centers over 20 megawatts, running to July 2029. It was prompted by a proposed campus of about 1,000 megawatts. | WAMC |
| State of New York (S10642 / A11560) | state bill | passed | 2026-06-04 | The legislature passed a bill that would impose a one-year moratorium on new state environmental permits for large data centers, along with cost-allocation rules. The Senate vote was 43-17. As of compilation it had not been delivered to or signed by the governor. | New York State Senate |
Full list: data center moratorium tracker.
See all states on the US AI data center map.
Source and license
This page is built on free public data from Epoch AI, a nonprofit research institute that tracks AI compute, chips and data centers. Epoch AI publishes its data under the Creative Commons Attribution 4.0 license (CC BY 4.0), which allows reuse with credit.
- Epoch AI, ‘AI data centers’. Published online at epoch.ai. Retrieved from ‘https://epoch.ai/data/ai-data-centers’ [online resource]. Retrieved 2026-11-27.
What we changed: we kept the US sites only; placed each site on the map from its street address (US Census geocoder), ZIP code centre or the town named in Epoch's sources, so positions are approximate; removed confidence tags from owner and user names; took planned power and dates from Epoch's construction timelines; and summed totals by state and company. State outlines: US Census Bureau (public domain), via the us-atlas project (ISC license).
Reuse: you may reuse this page’s charts, maps, tables, text and calculations, including for commercial use, under the CC BY 4.0 license. Credit both sources, for example: “Source: Superintelligence Index (thesuperintelligenceindex.com), based on Epoch AI data, CC BY 4.0”, and link to this page. Epoch AI’s underlying data stays under its own CC BY 4.0 license. Our terms of use do not restrict either.
Epoch AI provides its data as-is and without warranties; see sections 5 and 6 of the license (disclaimer of warranties and limitation of liability). Epoch AI is not affiliated with this site and does not endorse it or our calculations. Any errors in the adaptation are ours. Information only, not financial advice.
Map outline license (us-atlas)
State outlines are drawn from us-atlas v3 (states-10m), derived from US Census Bureau cartographic boundary files (public domain).
Copyright 2013-2019 Michael Bostock. Permission to use, copy, modify, and/or distribute this software for any purpose with or without fee is hereby granted, provided that the above copyright notice and this permission notice appear in all copies. THE SOFTWARE IS PROVIDED “AS IS” AND THE AUTHOR DISCLAIMS ALL WARRANTIES WITH REGARD TO THIS SOFTWARE INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS. IN NO EVENT SHALL THE AUTHOR BE LIABLE FOR ANY SPECIAL, DIRECT, INDIRECT, OR CONSEQUENTIAL DAMAGES OR ANY DAMAGES WHATSOEVER RESULTING FROM LOSS OF USE, DATA OR PROFITS, WHETHER IN AN ACTION OF CONTRACT, NEGLIGENCE OR OTHER TORTIOUS ACTION, ARISING OUT OF OR IN CONNECTION WITH THE USE OR PERFORMANCE OF THIS SOFTWARE.
Frequently asked questions
- How many AI data centers are in New York?
- Epoch AI tracks 2 large AI data centers in New York. Smaller and older data centers are not in the list.
- What is the largest AI data center in New York?
- Anthropic Lake Mariner in Barker, owned by AI XPV Platform, planned at 378 MW of IT power by Epoch's estimate.
- How much power do AI data centers in New York use?
- About 268 MW of IT power today across the tracked sites, rising to 436 MW when all are built.
- Which companies are building AI data centers in New York?
- By planned power: AI XPV Platform, Core42.
- Are there data center moratoriums in New York?
- Our tracker lists 4 local or state action(s) in New York; see the table on this page, each with sources.