7 large AI data centers in Ohio are tracked by Epoch AI, in New Albany, Columbus, Lancaster, Bowling Green…. Together they are planned to draw 2.9 GW of IT power, 9% of all tracked US AI capacity (rank 4 of 18 states with a page).
- 7 sites
- 1.5 GW online today
- 2.9 GW planned
- #4 US state by planned power
fully online partly online (solid area = share running today) under construction
The sites
| Data center | Location | Owner | Main users | Online now (MW) | Planned (MW) | Full power by |
|---|---|---|---|---|---|---|
| Meta Prometheus | New Albany | Meta | Meta | 471 | 1,022 | 2028-07 |
| Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. Next (2026-11): Socrates South and Socrates North gas power plants are fully operational, enabling the operability of Buildings 11-12 and 16-21. | ||||||
| Meta Bowling Green | Bowling Green | Meta | Meta | 0 | 422 | 2028-01 |
| Roofs of Buildings 1 and 2 are more than halfway complete. Next (2027-02): Building 1 is operational, based on a 5 month extrapolation from its roof completion date. | ||||||
| Google Columbus | Columbus | Google DeepMind | 303 | 386 | 2027-07 | |
| Confirmation that Building 4 is complete. Next (2027-07): Building 5 operational. | ||||||
| AWS New Albany | New Albany | Amazon | – | 213 | 338 | 2027-07 |
| Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months, but we're still not counting it operational due to visible construction… Next (2027-07): Expected operational date for the remaining tracked buildings (11, and 1-4) across the three campuses. | ||||||
| Google New Albany | New Albany | Google DeepMind | 333 | 333 | online | |
| Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building. | ||||||
| OpenAI Stargate Lordstown | Warren | Softbank | OpenAI | 0 | 214 | 2027-03 |
| Active construction visible on and around the datacenter, with the roofing mostly in place. Next (2027-03): Projected operational date. | ||||||
| Google Lancaster | Lancaster | – | 137 | 137 | online | |
| At this point, Building 1 and 2 have since already been operational. | ||||||
Grey rows: Epoch's latest construction note for each site, from satellite images, permits and filings.
Power coming online in Ohio
By the end of 2027 the tracked Ohio sites should reach about 2.44 GW of IT power. Hollow bars are planned dates.
online planned completion dates
Who builds and who uses them
Owners (by planned power): Meta (1.4 GW), Google (856 MW), Amazon (338 MW), Softbank (214 MW).
AI companies running on these sites: Meta, Google DeepMind, OpenAI.
Local opposition and moratoria in Ohio
| Where | Action | Status | Date | What it does | Sources |
|---|---|---|---|---|---|
| Trenton | zoning ban | in force | 2026-11-03 | Voters approved Issue 17, a city charter amendment that permanently bans large data centers in Trenton. | WVXU |
| Miamisburg | moratorium | in force | 2026-09-01 ends 2027-06-01 | The City Council voted 6-0 for a nine-month moratorium on data centers, prompted by interest in a data center at a former power station site. The end date is nine months after adoption. | City of Miamisburg |
| Cleveland | moratorium | extended | 2026-07-15 ends 2027-01-29 | The City Council voted 14-1 for a three-month moratorium on data centers while a working group drafts recommendations. In October it extended the moratorium to January 29, 2027. | Cleveland 19 News Baxtel |
| Butler County | moratorium | in force | 2026-06-16 ends 2026-12-16 | Commissioners unanimously approved a six-month moratorium on data centers in the six townships under county zoning: Hanover, Lemon, Madison, Milford, Oxford and Ross. The end date is six months after adoption. | WVXU |
| Jerome Township (Union County) | moratorium | unclear | 2025-09-03 | Trustees unanimously adopted a nine-month moratorium on new data center construction while they revisit zoning. The term ended around June 2026, and no renewal or replacement was confirmed. | WYSU / WOSU |
Full list: data center moratorium tracker.
See all states on the US AI data center map.
Source and license
This page is built on free public data from Epoch AI, a nonprofit research institute that tracks AI compute, chips and data centers. Epoch AI publishes its data under the Creative Commons Attribution 4.0 license (CC BY 4.0), which allows reuse with credit.
- Epoch AI, ‘AI data centers’. Published online at epoch.ai. Retrieved from ‘https://epoch.ai/data/ai-data-centers’ [online resource]. Retrieved 2026-11-27.
What we changed: we kept the US sites only; placed each site on the map from its street address (US Census geocoder), ZIP code centre or the town named in Epoch's sources, so positions are approximate; removed confidence tags from owner and user names; took planned power and dates from Epoch's construction timelines; and summed totals by state and company. State outlines: US Census Bureau (public domain), via the us-atlas project (ISC license).
Reuse: you may reuse this page’s charts, maps, tables, text and calculations, including for commercial use, under the CC BY 4.0 license. Credit both sources, for example: “Source: Superintelligence Index (thesuperintelligenceindex.com), based on Epoch AI data, CC BY 4.0”, and link to this page. Epoch AI’s underlying data stays under its own CC BY 4.0 license. Our terms of use do not restrict either.
Epoch AI provides its data as-is and without warranties; see sections 5 and 6 of the license (disclaimer of warranties and limitation of liability). Epoch AI is not affiliated with this site and does not endorse it or our calculations. Any errors in the adaptation are ours. Information only, not financial advice.
Map outline license (us-atlas)
State outlines are drawn from us-atlas v3 (states-10m), derived from US Census Bureau cartographic boundary files (public domain).
Copyright 2013-2019 Michael Bostock. Permission to use, copy, modify, and/or distribute this software for any purpose with or without fee is hereby granted, provided that the above copyright notice and this permission notice appear in all copies. THE SOFTWARE IS PROVIDED “AS IS” AND THE AUTHOR DISCLAIMS ALL WARRANTIES WITH REGARD TO THIS SOFTWARE INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS. IN NO EVENT SHALL THE AUTHOR BE LIABLE FOR ANY SPECIAL, DIRECT, INDIRECT, OR CONSEQUENTIAL DAMAGES OR ANY DAMAGES WHATSOEVER RESULTING FROM LOSS OF USE, DATA OR PROFITS, WHETHER IN AN ACTION OF CONTRACT, NEGLIGENCE OR OTHER TORTIOUS ACTION, ARISING OUT OF OR IN CONNECTION WITH THE USE OR PERFORMANCE OF THIS SOFTWARE.
Frequently asked questions
- How many AI data centers are in Ohio?
- Epoch AI tracks 7 large AI data centers in Ohio. Smaller and older data centers are not in the list.
- What is the largest AI data center in Ohio?
- Meta Prometheus in New Albany, owned by Meta, planned at 1.0 GW of IT power by Epoch's estimate.
- How much power do AI data centers in Ohio use?
- About 1.5 GW of IT power today across the tracked sites, rising to 2.9 GW when all are built.
- Which companies are building AI data centers in Ohio?
- By planned power: Meta, Google, Amazon, Softbank.
- Are there data center moratoriums in Ohio?
- Our tracker lists 5 local or state action(s) in Ohio; see the table on this page, each with sources.