Superintelligence Index

AI data centers in Ohio

7 large AI data centers in Ohio are tracked by Epoch AI, in New Albany, Columbus, Lancaster, Bowling Green…. Together they are planned to draw 2.9 GW of IT power, 9% of all tracked US AI capacity (rank 4 of 18 states with a page).

OhioMeta Prometheus — New Albany, Ohio. Owner Meta; users Meta. 471 MW online now, 1,022 MW planned by 2028-07. Epoch AI estimate.Meta Bowling Green — Bowling Green, Ohio. Owner Meta; users Meta. 0 MW online now, 422 MW planned by 2028-01. Epoch AI estimate.Google Columbus — Columbus, Ohio. Owner Google; users Google DeepMind. 303 MW online now, 386 MW planned by 2027-07. Epoch AI estimate.AWS New Albany — New Albany, Ohio. Owner Amazon; users unknown. 213 MW online now, 338 MW planned by 2027-07. Epoch AI estimate.Google New Albany — New Albany, Ohio. Owner Google; users Google DeepMind. 333 MW online now. Epoch AI estimate.OpenAI Stargate Lordstown — Warren, Ohio. Owner Softbank; users OpenAI. 0 MW online now, 214 MW planned by 2027-03. Epoch AI estimate.Google Lancaster — Lancaster, Ohio. Owner Google; users unknown. 137 MW online now. Epoch AI estimate.New Albany 1.7 GWBowling Green 422 MWColumbus 386 MWWarren 214 MWLancaster 137 MW
Circle area = planned IT power. Locations approximate.

fully online partly online (solid area = share running today) under construction

The sites

Data centerLocationOwnerMain usersOnline now (MW)Planned (MW)Full power by
Meta PrometheusNew AlbanyMetaMeta4711,0222028-07
Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. Next (2026-11): Socrates South and Socrates North gas power plants are fully operational, enabling the operability of Buildings 11-12 and 16-21.
Meta Bowling GreenBowling GreenMetaMeta04222028-01
Roofs of Buildings 1 and 2 are more than halfway complete. Next (2027-02): Building 1 is operational, based on a 5 month extrapolation from its roof completion date.
Google ColumbusColumbusGoogleGoogle DeepMind3033862027-07
Confirmation that Building 4 is complete. Next (2027-07): Building 5 operational.
AWS New AlbanyNew AlbanyAmazon–2133382027-07
Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months, but we're still not counting it operational due to visible construction… Next (2027-07): Expected operational date for the remaining tracked buildings (11, and 1-4) across the three campuses.
Google New AlbanyNew AlbanyGoogleGoogle DeepMind333333online
Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building.
OpenAI Stargate LordstownWarrenSoftbankOpenAI02142027-03
Active construction visible on and around the datacenter, with the roofing mostly in place. Next (2027-03): Projected operational date.
Google LancasterLancasterGoogle–137137online
At this point, Building 1 and 2 have since already been operational.

Grey rows: Epoch's latest construction note for each site, from satellite images, permits and filings.

Source: Epoch AI, ‘AI data centers’, licensed under CC BY 4.0; adapted by us (see Source and license below). Retrieved 2026-11-27.Estimates; locations approximate

Power coming online in Ohio

By the end of 2027 the tracked Ohio sites should reach about 2.44 GW of IT power. Hollow bars are planned dates.

0 GW1 GW2 GW3 GW202320242025202620272028End 2023: 0.00 GW IT powerEnd 2024: 0.39 GW IT powerEnd 2025: 0.88 GW IT powerToday: 1.46 GW IT powerEnd 2027: 2.44 GW IT powerEnd 2028: 2.85 GW IT power

online planned completion dates

Who builds and who uses them

Owners (by planned power): Meta (1.4 GW), Google (856 MW), Amazon (338 MW), Softbank (214 MW).
AI companies running on these sites: Meta, Google DeepMind, OpenAI.

Local opposition and moratoria in Ohio

WhereActionStatusDateWhat it doesSources
Trentonzoning banin force2026-11-03Voters approved Issue 17, a city charter amendment that permanently bans large data centers in Trenton.WVXU
Miamisburgmoratoriumin force2026-09-01
ends 2027-06-01
The City Council voted 6-0 for a nine-month moratorium on data centers, prompted by interest in a data center at a former power station site. The end date is nine months after adoption.City of Miamisburg
Clevelandmoratoriumextended2026-07-15
ends 2027-01-29
The City Council voted 14-1 for a three-month moratorium on data centers while a working group drafts recommendations. In October it extended the moratorium to January 29, 2027.Cleveland 19 News Baxtel
Butler Countymoratoriumin force2026-06-16
ends 2026-12-16
Commissioners unanimously approved a six-month moratorium on data centers in the six townships under county zoning: Hanover, Lemon, Madison, Milford, Oxford and Ross. The end date is six months after adoption.WVXU
Jerome Township (Union County)moratoriumunclear2025-09-03Trustees unanimously adopted a nine-month moratorium on new data center construction while they revisit zoning. The term ended around June 2026, and no renewal or replacement was confirmed.WYSU / WOSU

Full list: data center moratorium tracker.

See all states on the US AI data center map.

Source and license

This page is built on free public data from Epoch AI, a nonprofit research institute that tracks AI compute, chips and data centers. Epoch AI publishes its data under the Creative Commons Attribution 4.0 license (CC BY 4.0), which allows reuse with credit.

What we changed: we kept the US sites only; placed each site on the map from its street address (US Census geocoder), ZIP code centre or the town named in Epoch's sources, so positions are approximate; removed confidence tags from owner and user names; took planned power and dates from Epoch's construction timelines; and summed totals by state and company. State outlines: US Census Bureau (public domain), via the us-atlas project (ISC license).

Reuse: you may reuse this page’s charts, maps, tables, text and calculations, including for commercial use, under the CC BY 4.0 license. Credit both sources, for example: “Source: Superintelligence Index (thesuperintelligenceindex.com), based on Epoch AI data, CC BY 4.0”, and link to this page. Epoch AI’s underlying data stays under its own CC BY 4.0 license. Our terms of use do not restrict either.

Epoch AI provides its data as-is and without warranties; see sections 5 and 6 of the license (disclaimer of warranties and limitation of liability). Epoch AI is not affiliated with this site and does not endorse it or our calculations. Any errors in the adaptation are ours. Information only, not financial advice.

Map outline license (us-atlas)

State outlines are drawn from us-atlas v3 (states-10m), derived from US Census Bureau cartographic boundary files (public domain).

Copyright 2013-2019 Michael Bostock. Permission to use, copy, modify, and/or distribute this software for any purpose with or without fee is hereby granted, provided that the above copyright notice and this permission notice appear in all copies. THE SOFTWARE IS PROVIDED “AS IS” AND THE AUTHOR DISCLAIMS ALL WARRANTIES WITH REGARD TO THIS SOFTWARE INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS. IN NO EVENT SHALL THE AUTHOR BE LIABLE FOR ANY SPECIAL, DIRECT, INDIRECT, OR CONSEQUENTIAL DAMAGES OR ANY DAMAGES WHATSOEVER RESULTING FROM LOSS OF USE, DATA OR PROFITS, WHETHER IN AN ACTION OF CONTRACT, NEGLIGENCE OR OTHER TORTIOUS ACTION, ARISING OUT OF OR IN CONNECTION WITH THE USE OR PERFORMANCE OF THIS SOFTWARE.

Frequently asked questions

How many AI data centers are in Ohio?
Epoch AI tracks 7 large AI data centers in Ohio. Smaller and older data centers are not in the list.
What is the largest AI data center in Ohio?
Meta Prometheus in New Albany, owned by Meta, planned at 1.0 GW of IT power by Epoch's estimate.
How much power do AI data centers in Ohio use?
About 1.5 GW of IT power today across the tracked sites, rising to 2.9 GW when all are built.
Which companies are building AI data centers in Ohio?
By planned power: Meta, Google, Amazon, Softbank.
Are there data center moratoriums in Ohio?
Our tracker lists 5 local or state action(s) in Ohio; see the table on this page, each with sources.