8 large US AI data centers that Epoch AI tracks are owned by Microsoft or run its AI work, in 6 states. Together they are planned to reach 4.1 GW of IT power; 4.1 GW of it at sites Microsoft owns.

AlabamaArizonaColoradoFloridaGeorgiaIndianaKansasMaineMassachusettsMinnesotaNew JerseyNorth CarolinaNorth DakotaOklahomaPennsylvaniaSouth DakotaTexasWyomingConnecticutMissouriWest VirginiaIllinoisNew MexicoArkansasCaliforniaDelawareDistrict of ColumbiaIowaKentuckyMarylandMichiganMississippiMontanaNew HampshireNew YorkOhioOregonTennesseeUtahVirginiaWashingtonWisconsinNebraskaSouth CarolinaIdahoNevadaVermontLouisianaRhode IslandMicrosoft Fairwater Wisconsin — Mount Pleasant, Wisconsin. Owner Microsoft; users OpenAI, Microsoft. 369 MW online now, 2,263 MW planned by 2028-05. Epoch AI estimate.Crusoe Abilene Expansion — Abilene, Texas. Owner Microsoft; users Microsoft. 0 MW online now, 672 MW planned by 2027-11. Epoch AI estimate.Microsoft Fairwater Atlanta — Fayetteville, Georgia. Owner Microsoft; users OpenAI, Microsoft. 636 MW online now. Epoch AI estimate.Microsoft Goodyear — Goodyear, Arizona. Owner Microsoft; users OpenAI, Microsoft. 202 MW online now. Epoch AI estimate.Microsoft Project Osmium — Cumming, Iowa. Owner Microsoft; users OpenAI. 190 MW online now. Epoch AI estimate.Microsoft SAT40 — San Antonio, Texas. Owner Microsoft; users unknown. 75 MW online now. Epoch AI estimate.Microsoft-Nebius New Jersey — Vineland, New Jersey. Owner Nebius; users Microsoft. 50 MW online now. Epoch AI estimate.Microsoft SAT14 — San Antonio, Texas. Owner Microsoft; users unknown. 47 MW online now. Epoch AI estimate.Mount Pleasant 2.3 GWAbilene 672 MWFayetteville 636 MWGoodyear 202 MWCumming 190 MWSan Antonio 122 MWVineland 50 MW
Circle area = planned IT power. Locations approximate.

fully online partly online (solid area = share running today) under construction

Source: Epoch AI, ‘AI data centers’, licensed under CC BY 4.0; adapted by us (see Source and license below). Retrieved 2026-11-27.Estimates; locations approximate

All Microsoft sites

Data centerLocationMicrosoft isOwnerMain users Online now (MW)Planned (MW)Full power by
Microsoft Fairwater WisconsinMount Pleasant, Wisconsinowner and userMicrosoftOpenAI, Microsoft3692,2632028-05
Crusoe Abilene ExpansionAbilene, Texasowner and userMicrosoftMicrosoft06722027-11
Microsoft Fairwater AtlantaFayetteville, Georgiaowner and userMicrosoftOpenAI, Microsoft636636online
Microsoft GoodyearGoodyear, Arizonaowner and userMicrosoftOpenAI, Microsoft202202online
Microsoft Project OsmiumCumming, IowaownerMicrosoftOpenAI190190online
Microsoft SAT40San Antonio, TexasownerMicrosoft–7575online
Microsoft-Nebius New JerseyVineland, New JerseytenantNebiusMicrosoft5050online
Microsoft SAT14San Antonio, TexasownerMicrosoft–4747online

By state: Texas (3), Georgia (1), Wisconsin (1), Arizona (1), Iowa (1), New Jersey (1).

Power coming online

By the end of 2027 these sites should reach about 2.61 GW of IT power, by Epoch's construction timelines.

0 GW1 GW2 GW3 GW4 GW202320242025202620272028End 2023: 0.14 GW IT powerEnd 2024: 0.20 GW IT powerEnd 2025: 0.81 GW IT powerToday: 1.57 GW IT powerEnd 2027: 2.61 GW IT powerEnd 2028: 4.13 GW IT power

online planned completion dates

Partners at these sites

OpenAI (4), Nebius (1): other owners or AI tenants at the same sites (number of sites).

Source: Epoch AI, ‘AI data centers’, licensed under CC BY 4.0; adapted by us (see Source and license below). Retrieved 2026-11-27.Estimates; locations approximate

All companies on the US AI data center map.

Source and license

This page is built on free public data from Epoch AI, a nonprofit research institute that tracks AI compute, chips and data centers. Epoch AI publishes its data under the Creative Commons Attribution 4.0 license (CC BY 4.0), which allows reuse with credit.

What we changed: we kept the US sites only; placed each site on the map from its street address (US Census geocoder), ZIP code centre or the town named in Epoch's sources, so positions are approximate; removed confidence tags from owner and user names; took planned power and dates from Epoch's construction timelines; and summed totals by state and company. State outlines: US Census Bureau (public domain), via the us-atlas project (ISC license).

Reuse: you may reuse this page’s charts, maps, tables, text and calculations, including for commercial use, under the CC BY 4.0 license. Credit both sources, for example: “Source: Superintelligence Index (thesuperintelligenceindex.com), based on Epoch AI data, CC BY 4.0”, and link to this page. Epoch AI’s underlying data stays under its own CC BY 4.0 license. Our terms of use do not restrict either.

Epoch AI provides its data as-is and without warranties; see sections 5 and 6 of the license (disclaimer of warranties and limitation of liability). Epoch AI is not affiliated with this site and does not endorse it or our calculations. Any errors in the adaptation are ours. Information only, not financial advice.

Map outline license (us-atlas)

State outlines are drawn from us-atlas v3 (states-10m), derived from US Census Bureau cartographic boundary files (public domain).

Copyright 2013-2019 Michael Bostock. Permission to use, copy, modify, and/or distribute this software for any purpose with or without fee is hereby granted, provided that the above copyright notice and this permission notice appear in all copies. THE SOFTWARE IS PROVIDED “AS IS” AND THE AUTHOR DISCLAIMS ALL WARRANTIES WITH REGARD TO THIS SOFTWARE INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS. IN NO EVENT SHALL THE AUTHOR BE LIABLE FOR ANY SPECIAL, DIRECT, INDIRECT, OR CONSEQUENTIAL DAMAGES OR ANY DAMAGES WHATSOEVER RESULTING FROM LOSS OF USE, DATA OR PROFITS, WHETHER IN AN ACTION OF CONTRACT, NEGLIGENCE OR OTHER TORTIOUS ACTION, ARISING OUT OF OR IN CONNECTION WITH THE USE OR PERFORMANCE OF THIS SOFTWARE.

Frequently asked questions

Where are Microsoft's AI data centers?
Epoch AI tracks 8 large US AI data centers linked to Microsoft, in Texas, Georgia, Wisconsin, Arizona, Iowa, New Jersey.
What is Microsoft's largest AI data center?
Microsoft Fairwater Wisconsin in Mount Pleasant, Wisconsin, planned at 2.3 GW of IT power (Epoch estimate; Microsoft is owner and user there).
How much AI data center power does Microsoft have?
About 1.6 GW online today at the tracked US sites, rising to 4.1 GW as buildings finish. Older cloud data centers not in Epoch's list are not counted.